Search locally stored ratings and recall applications. Snapshot downloaded 2026-10-03. This archive does not check whether a recall was completed on your individual vehicle.
17309 variant records · Page 20
Choose the matching body, drivetrain and production release. Pre-2011 ratings use the earlier NCAP program. Frontal and overall stars should be compared within similar vehicle weights (±250 lb). Missing ratings are not zero stars. Equipment availability is not a crash-test score.
2026 MERCEDES-BENZ C-CLASS PHEV
4 DR · AWD · Production release 1
Overall starsNot rated
Frontal starsNot rated
Side starsNot rated
Rollover starsNot rated
Available source fields & applicability
Body style
4 DR
Drivetrain
AWD
Production release
1
Reported seating
5
Blind spot detection availability
Optional
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
These ratings do not apply to vehicles equipped with rear seat torso air bags or equipped with front seat PRE-SAFE side air bags. These ratings also do not apply to vehicles with seats in the third row.
Pole notes
These ratings do not apply to vehicles with front seat PRE-SAFE side air bags. These ratings also do not apply to vehicles with seats in the third row.
Blind spot detection availability
Optional
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
These ratings do not apply to vehicles equipped with rear seat torso air bags or equipped with front seat PRE-SAFE side air bags. These ratings also do not apply to vehicles with seats in the third row.
Pole notes
These ratings do not apply to vehicles with front seat PRE-SAFE side air bags. These ratings also do not apply to vehicles with seats in the third row.
Blind spot detection availability
Optional
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
Production release: 1 = early, 2 = later, 3 = latest. Potentially affected units are a source campaign figure; do not add it across applications. These are source-specific records, not a verified match to an EPA retail trim.
NHTSA public datasets · US Department of Transportation. Not endorsed by NHTSA. The normalized download excludes tested-vehicle VINs and retains raw-source hashes. Crash test weight remains a tested-vehicle reference.